Battersea Power Station

Exceptional Achievement

TFS are proud to be involved in the largest regeneration development in Europe at Battersea Power Station. In partnership with approved installer B&K Systems, TFS are supplying circa 60,000m2 of TLA Lightweight Screed with Cemfloor, Concrete & Screed Toppings. Along with a bespoke Acoustic Floating Floor solution to the Cinemas and Resilient Acoustic Layers to various areas, TFS are providing a one-stop shop for all acoustic and thermal insulation requirements within the Floor Zone.

 

 

Presenting a number of unique challenges, the requirements for a lightweight insulation and void former with both exceptional strength and a dynamic, flexible install method to fit a demanding programme. With a large amount of existing floors retained weight was a key factor during the tender process, the ability of TLA to be laid on virtually any surface, taking out any imperfections and providing a strong, level surface for following trades was essential to achieving the wider project programme. Batched on-site in a mobile plant, the ability to move around site adapting to the changing logistic and access requirements is essential.

 

 

Pouring over 1000m2 per day at depths varying from 50mm to 850mm thick; Changing pour locations, sizes and times on a daily basis; the ability to have a flexible, self-sufficient approach is integral to achieving both programme and productivity targets. The ability to vary the depth, strength and traffic times at short notice allows us to react to changing site priorities. The computer controlled mobile batching plant ensures consistency and thorough quality processes ensure a transparent, traceable chain of documentation uploaded directly to the online client portal give results and updates remotely and in real time.